24,000+ questions & coding problemsSoftware & IT16,274 questionsGovernment jobs26 examsAptitudenew questions every timeAI practice interviewwith feedback65 topics to practiseMechanical1,149 questionsGATE ME9 papersEngineering Mathematics381 questions2-minute checkfreeDSA Problems1,422Civil1,005 questionsGATE CE9 papersCS Fundamentals1,209 questionsYour scores6 skillsSystem Design25Electrical / EEE1,047 questionsGATE EE9 papersRun your codeC++ · Java · PythonLow-Level Design144Electronics & Comm.975 questionsGATE EC9 papersAI help on every questionFull-Stack6,282Chemical1,005 questionsGATE CH9 papersAI whiteboardsystem designWork abroadEurope · remote · transfersESE ME1 paperGATE practice papers2019–2026ESE CE1 paperDate alertsbefore the last dateESE EE1 paperBehavioural courseHR round practiceESE ET1 paperResume optimizerSSC JE ME1 paperApplication trackerSSC JE CE1 paperCompany-wise prepSSC JE EE1 paperRole roadmapsRRB JE1 subjectPriced in ₹UPI · cardsISRO SC1 paperGATE CS9 papersIBPS SO IT1 paperUGC NET CS1 paperSSC CGL26 papersIBPS PO26 papersRRB NTPC26 papersSSC CHSL26 papersIBPS Clerk26 papersSBI Clerk26 papersRRB Group D26 papersSSC CPO26 papersSSC GD26 papers

Safety & HSE interview questions

27 real Safety & HSE questions from the Site & Project Mgmt bank, as asked in Indian campus drives and tech interviews. Every question has a verified answer and an AI-tutor explanation on placd — free to start.

1. What is IS 3696?

Junior
  1. A.10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  2. B.trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  3. C.safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
  4. D.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
Reveal the answer + AI explanation — free account

3. Which statement is correct?

Junior
  1. A.IS 3696 — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  2. B.IS 3696 — no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  3. C.IS 3696 — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  4. D.IS 3696 — safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
Reveal the answer + AI explanation — free account

4. What is Hierarchy of controls?

Junior
  1. A.written authorisation for hot work, confined space, electrical isolation, excavation and work at height, with checks, time validity and formal closure
  2. B.elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  3. C.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
  4. D.no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
Reveal the answer + AI explanation — free account

5. Which term means: "elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence"?

Junior
  1. A.Near-miss reporting
  2. B.Hierarchy of controls
  3. C.Excavation safety
  4. D.Scaffold inspection tag
Reveal the answer + AI explanation — free account

6. Which statement is correct?

Junior
  1. A.Hierarchy of controls — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  2. B.Hierarchy of controls — any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
  3. C.Hierarchy of controls — elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  4. D.Hierarchy of controls — no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
Reveal the answer + AI explanation — free account

7. What is Toolbox talk?

Junior
  1. A.safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
  2. B.elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  3. C.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
  4. D.10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
Reveal the answer + AI explanation — free account

8. Which term means: "10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded"?

Junior
  1. A.Work at height
  2. B.Hierarchy of controls
  3. C.Permit-to-work
  4. D.Toolbox talk
Reveal the answer + AI explanation — free account

9. Which statement is correct?

Junior
  1. A.Toolbox talk — no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  2. B.Toolbox talk — elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  3. C.Toolbox talk — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  4. D.Toolbox talk — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
Reveal the answer + AI explanation — free account

10. What is Permit-to-work?

Junior
  1. A.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
  2. B.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  3. C.written authorisation for hot work, confined space, electrical isolation, excavation and work at height, with checks, time validity and formal closure
  4. D.safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
Reveal the answer + AI explanation — free account

11. Which term means: "written authorisation for hot work, confined space, electrical isolation, excavation and work at height, with checks, time validity and formal closure"?

Junior
  1. A.Hierarchy of controls
  2. B.Work at height
  3. C.Near-miss reporting
  4. D.Permit-to-work
Reveal the answer + AI explanation — free account

12. Which statement is correct?

Junior
  1. A.Permit-to-work — no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  2. B.Permit-to-work — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  3. C.Permit-to-work — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  4. D.Permit-to-work — written authorisation for hot work, confined space, electrical isolation, excavation and work at height, with checks, time validity and formal closure
Reveal the answer + AI explanation — free account

13. What is Work at height?

Mid
  1. A.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  2. B.no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  3. C.any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
  4. D.10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
Reveal the answer + AI explanation — free account

14. Which term means: "any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets"?

Mid
  1. A.Work at height
  2. B.Permit-to-work
  3. C.Toolbox talk
  4. D.Scaffold inspection tag
Reveal the answer + AI explanation — free account

15. Which statement is correct?

Mid
  1. A.Work at height — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  2. B.Work at height — safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
  3. C.Work at height — elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  4. D.Work at height — any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
Reveal the answer + AI explanation — free account

16. What is Excavation safety?

Mid
  1. A.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  2. B.trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  3. C.any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
  4. D.10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
Reveal the answer + AI explanation — free account

17. Which term means: "trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain"?

Mid
  1. A.Work at height
  2. B.Near-miss reporting
  3. C.Excavation safety
  4. D.IS 3696
Reveal the answer + AI explanation — free account

18. Which statement is correct?

Mid
  1. A.Excavation safety — green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  2. B.Excavation safety — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  3. C.Excavation safety — elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  4. D.Excavation safety — safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
Reveal the answer + AI explanation — free account

19. What is Scaffold inspection tag?

Junior
  1. A.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  2. B.safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
  3. C.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
  4. D.10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
Reveal the answer + AI explanation — free account

20. Which term means: "green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use"?

Junior
  1. A.Scaffold inspection tag
  2. B.IS 3696
  3. C.Work at height
  4. D.Toolbox talk
Reveal the answer + AI explanation — free account

21. Which statement is correct?

Junior
  1. A.Scaffold inspection tag — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  2. B.Scaffold inspection tag — trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  3. C.Scaffold inspection tag — green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  4. D.Scaffold inspection tag — any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
Reveal the answer + AI explanation — free account

22. What is BOCW Act?

Mid
  1. A.safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
  2. B.trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  3. C.green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  4. D.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
Reveal the answer + AI explanation — free account

23. Which term means: "Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020"?

Mid
  1. A.Near-miss reporting
  2. B.BOCW Act
  3. C.IS 3696
  4. D.Toolbox talk
Reveal the answer + AI explanation — free account

24. Which statement is correct?

Mid
  1. A.BOCW Act — Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
  2. B.BOCW Act — any task above 1.8 m needing a full-body harness with double lanyard clipped to a lifeline or anchor rated 22 kN, plus guardrails or nets
  3. C.BOCW Act — written authorisation for hot work, confined space, electrical isolation, excavation and work at height, with checks, time validity and formal closure
  4. D.BOCW Act — safety code for scaffolds in Part 1 and ladders in Part 2, complementing IS 3764 for excavation and IS 4130 for demolition
Reveal the answer + AI explanation — free account

25. What is Near-miss reporting?

Senior
  1. A.trenches deeper than 1.5 m must be shored or battered, spoil kept clear of the edge, ladders provided and daily inspection made after rain
  2. B.elimination, substitution, engineering controls and administrative controls come before personal protective equipment, which is the last line of defence
  3. C.no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  4. D.Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
Reveal the answer + AI explanation — free account

26. Which term means: "no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses"?

Senior
  1. A.Hierarchy of controls
  2. B.Work at height
  3. C.BOCW Act
  4. D.Near-miss reporting
Reveal the answer + AI explanation — free account

27. Which statement is correct?

Senior
  1. A.Near-miss reporting — no-blame logging of incidents that caused no injury but could have, used as a leading indicator because serious accidents follow many near misses
  2. B.Near-miss reporting — green tag after a competent person's check before use, every 7 days and after alteration or storms, with red tag meaning do not use
  3. C.Near-miss reporting — 10 to 15 minute briefing at the workface each morning covering the day's tasks, hazards and controls, with attendance recorded
  4. D.Near-miss reporting — Building and Other Construction Workers Act 1996 with a 1 percent welfare cess on construction cost, registration above 10 workers, being subsumed into the OSH Code 2020
Reveal the answer + AI explanation — free account

Free to start

Answers, AI explanations, and a free readiness check

Sign up free to check your answers with explanations, ask the AI tutor anything on any question, and take the free 2-minute readiness check for a scored result. The full AI mock interview, scored like a real panel, unlocks with Pro.

Practice Safety & HSE free