1. What is BOT toll vs annuity?
Junior
A.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
B.2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
C.concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
D.Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
2. Which term means: "concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI"?
A.BOT toll vs annuity — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
B.BOT toll vs annuity — 2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
C.BOT toll vs annuity — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
D.BOT toll vs annuity — concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
A.concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
B.100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
C.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
D.government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk
5. Which term means: "government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk"?
A.MoRTH EPC contract — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
B.MoRTH EPC contract — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
C.MoRTH EPC contract — rural roads scheme connecting habitations of 500 or more people with all-weather roads per IRC SP 20, with 5-year contractor maintenance
D.MoRTH EPC contract — government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk
A.government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk
B.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
C.Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
D.100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
8. Which term means: "shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining"?
A.Cut-and-cover vs TBM — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
B.Cut-and-cover vs TBM — shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
C.Cut-and-cover vs TBM — Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
D.Cut-and-cover vs TBM — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
A.Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
B.concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
C.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
D.precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
11. Which term means: "precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track"?
A.Metro viaduct construction — shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
B.Metro viaduct construction — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
C.Metro viaduct construction — 100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
D.Metro viaduct construction — rural roads scheme connecting habitations of 500 or more people with all-weather roads per IRC SP 20, with 5-year contractor maintenance
14. Which term means: "Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed"?
A.Dedicated Freight Corridor — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
B.Dedicated Freight Corridor — government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk
C.Dedicated Freight Corridor — 2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
D.Dedicated Freight Corridor — Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
A.2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
B.rural roads scheme connecting habitations of 500 or more people with all-weather roads per IRC SP 20, with 5-year contractor maintenance
C.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
D.Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
17. Which term means: "rural roads scheme connecting habitations of 500 or more people with all-weather roads per IRC SP 20, with 5-year contractor maintenance"?
A.PMGSY — Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
B.PMGSY — 2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
C.PMGSY — rural roads scheme connecting habitations of 500 or more people with all-weather roads per IRC SP 20, with 5-year contractor maintenance
D.PMGSY — concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
20. Which term means: "2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees"?
A.Jal Jeevan Mission — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
B.Jal Jeevan Mission — 100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
C.Jal Jeevan Mission — 2019 mission for a functional household tap connection to every rural home at 55 lpcd, run through village water and sanitation committees
D.Jal Jeevan Mission — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
A.Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
B.precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
C.100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
D.concessionaire finances, builds and operates for 20 to 30 years recovering cost from toll with traffic risk, or receives fixed semi-annual payments from NHAI
A.Smart Cities Mission — Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
B.Smart Cities Mission — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
C.Smart Cities Mission — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track
D.Smart Cities Mission — 100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
A.100 cities funded through special purpose vehicles for area-based development and integrated command and control centres
B.Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
C.government-funded lump-sum design-build under the model EPC agreement with milestone-linked payments and contractor-borne design risk
D.shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
26. Which term means: "Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651"?
A.Port infrastructure — shallow stations built top-down between diaphragm walls, while running tunnels are bored by earth-pressure-balance or slurry machines with segmental lining
B.Port infrastructure — Eastern and Western corridors of about 1300 and 1500 km built for 25 t axle loads, double-stack containers and 100 km/h freight speed
C.Port infrastructure — Sagarmala-led development of berths, quay walls, dredging and breakwaters, with major ports governed by the Major Port Authorities Act 2021 and berths designed to IS 4651
D.Port infrastructure — precast prestressed U-girders or segmental box girders launched onto single piers at 25 to 30 m spacing with ballastless track