24,000+ questions & coding problemsSoftware & IT16,274 questionsGovernment jobs26 examsAptitudenew questions every timeAI practice interviewwith feedback65 topics to practiseMechanical1,149 questionsGATE ME9 papersEngineering Mathematics381 questions2-minute checkfreeDSA Problems1,422Civil1,005 questionsGATE CE9 papersCS Fundamentals1,209 questionsYour scores6 skillsSystem Design25Electrical / EEE1,047 questionsGATE EE9 papersRun your codeC++ · Java · PythonLow-Level Design144Electronics & Comm.975 questionsGATE EC9 papersAI help on every questionFull-Stack6,282Chemical1,005 questionsGATE CH9 papersAI whiteboardsystem designWork abroadEurope · remote · transfersESE ME1 paperGATE practice papers2019–2026ESE CE1 paperDate alertsbefore the last dateESE EE1 paperBehavioural courseHR round practiceESE ET1 paperResume optimizerSSC JE ME1 paperApplication trackerSSC JE CE1 paperCompany-wise prepSSC JE EE1 paperRole roadmapsRRB JE1 subjectPriced in ₹UPI · cardsISRO SC1 paperGATE CS9 papersIBPS SO IT1 paperUGC NET CS1 paperSSC CGL26 papersIBPS PO26 papersRRB NTPC26 papersSSC CHSL26 papersIBPS Clerk26 papersSBI Clerk26 papersRRB Group D26 papersSSC CPO26 papersSSC GD26 papers

Testing & Standards interview questions

27 real Testing & Standards questions from the Embedded Systems bank, as asked in Indian campus drives and tech interviews. Every question has a verified answer and an AI-tutor explanation on placd — free to start.

1. What is MISRA C:2012?

Junior
  1. A.tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  2. B.medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
  3. C.coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated
  4. D.statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
Reveal the answer + AI explanation — free account

2. Which term means: "coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated"?

Junior
  1. A.MISRA C:2012
  2. B.IEC 61508
  3. C.IEC 62304
  4. D.DO-178C
Reveal the answer + AI explanation — free account

3. Which statement is correct?

Junior
  1. A.MISRA C:2012 — basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  2. B.MISRA C:2012 — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  3. C.MISRA C:2012 — coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated
  4. D.MISRA C:2012 — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
Reveal the answer + AI explanation — free account

4. What is HIL versus SIL?

Junior
  1. A.European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  2. B.basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  3. C.software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  4. D.radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
Reveal the answer + AI explanation — free account

5. Which term means: "software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O"?

Junior
  1. A.Static analysis
  2. B.HIL versus SIL
  3. C.MISRA C:2012
  4. D.EMC testing
Reveal the answer + AI explanation — free account

6. Which statement is correct?

Junior
  1. A.HIL versus SIL — radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  2. B.HIL versus SIL — software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  3. C.HIL versus SIL — airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
  4. D.HIL versus SIL — basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
Reveal the answer + AI explanation — free account

7. What is Static analysis?

Junior
  1. A.tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  2. B.radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  3. C.coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated
  4. D.European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
Reveal the answer + AI explanation — free account

8. Which term means: "tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it"?

Junior
  1. A.EMC testing
  2. B.IEC 62304
  3. C.Static analysis
  4. D.HIL versus SIL
Reveal the answer + AI explanation — free account

9. Which statement is correct?

Junior
  1. A.Static analysis — software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  2. B.Static analysis — radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  3. C.Static analysis — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  4. D.Static analysis — medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
Reveal the answer + AI explanation — free account

10. What is IEC 61508?

Mid
  1. A.software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  2. B.tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  3. C.airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
  4. D.basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
Reveal the answer + AI explanation — free account

11. Which term means: "basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511"?

Mid
  1. A.Static analysis
  2. B.MISRA C:2012
  3. C.IEC 61508
  4. D.HIL versus SIL
Reveal the answer + AI explanation — free account

12. Which statement is correct?

Mid
  1. A.IEC 61508 — radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  2. B.IEC 61508 — basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  3. C.IEC 61508 — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
  4. D.IEC 61508 — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
Reveal the answer + AI explanation — free account

13. What is IEC 62304?

Mid
  1. A.software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  2. B.European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  3. C.medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
  4. D.statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
Reveal the answer + AI explanation — free account

14. Which term means: "medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour"?

Mid
  1. A.Static analysis
  2. B.IEC 61508
  3. C.IEC 62304
  4. D.Code coverage metrics
Reveal the answer + AI explanation — free account

15. Which statement is correct?

Mid
  1. A.IEC 62304 — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  2. B.IEC 62304 — European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  3. C.IEC 62304 — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
  4. D.IEC 62304 — medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
Reveal the answer + AI explanation — free account

16. What is DO-178C?

Mid
  1. A.coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated
  2. B.radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  3. C.software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  4. D.airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
Reveal the answer + AI explanation — free account

17. Which term means: "airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A"?

Mid
  1. A.EMC testing
  2. B.Code coverage metrics
  3. C.MISRA C:2012
  4. D.DO-178C
Reveal the answer + AI explanation — free account

18. Which statement is correct?

Mid
  1. A.DO-178C — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
  2. B.DO-178C — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  3. C.DO-178C — medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
  4. D.DO-178C — airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
Reveal the answer + AI explanation — free account

19. What is CE and FCC marking?

Mid
  1. A.software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  2. B.European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  3. C.basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  4. D.radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
Reveal the answer + AI explanation — free account

20. Which term means: "European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US"?

Mid
  1. A.CE and FCC marking
  2. B.EMC testing
  3. C.MISRA C:2012
  4. D.Code coverage metrics
Reveal the answer + AI explanation — free account

21. Which statement is correct?

Mid
  1. A.CE and FCC marking — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
  2. B.CE and FCC marking — European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  3. C.CE and FCC marking — basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  4. D.CE and FCC marking — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
Reveal the answer + AI explanation — free account

22. What is EMC testing?

Mid
  1. A.basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
  2. B.coding guidelines with mandatory, required and advisory rules restricting C to a safer subset, with compliance requiring recorded deviations for any required rule violated
  3. C.tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  4. D.radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
Reveal the answer + AI explanation — free account

23. Which term means: "radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber"?

Mid
  1. A.HIL versus SIL
  2. B.MISRA C:2012
  3. C.DO-178C
  4. D.EMC testing
Reveal the answer + AI explanation — free account

24. Which statement is correct?

Mid
  1. A.EMC testing — tools such as Coverity, Polyspace or Cppcheck finding null dereferences, overflows and coding-rule violations by examining source without executing it
  2. B.EMC testing — radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  3. C.EMC testing — European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  4. D.EMC testing — medical device software lifecycle standard with safety classes A, B and C by harm potential, dictating documentation, risk management and problem-resolution rigour
Reveal the answer + AI explanation — free account

25. What is Code coverage metrics?

Senior
  1. A.airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
  2. B.European conformity declaration under directives such as EMC 2014/30/EU and RED 2014/53/EU; FCC Part 15 certifies unintentional and intentional radiators for the US
  3. C.statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
  4. D.basic functional safety standard for E/E/PE systems defining SIL 1–4 by probability of dangerous failure, the parent of ISO 26262, IEC 62304 and IEC 61511
Reveal the answer + AI explanation — free account

26. Which term means: "statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome"?

Senior
  1. A.MISRA C:2012
  2. B.Code coverage metrics
  3. C.IEC 61508
  4. D.CE and FCC marking
Reveal the answer + AI explanation — free account

27. Which statement is correct?

Senior
  1. A.Code coverage metrics — radiated and conducted emissions per CISPR 32 and immunity per IEC 61000-4-x (ESD, radiated RF, fast transients, surge), run at an accredited lab in a semi-anechoic chamber
  2. B.Code coverage metrics — software-in-the-loop runs the controller code against a plant model on a PC; hardware-in-the-loop runs the real ECU against a real-time simulator with physical I/O
  3. C.Code coverage metrics — airborne software standard with design assurance levels A to E, requiring traceability from requirements to tests and structural coverage up to MC/DC at Level A
  4. D.Code coverage metrics — statement, branch and MC/DC; modified condition/decision coverage, required for DO-178C Level A and ASIL D, shows each condition independently affects the decision outcome
Reveal the answer + AI explanation — free account

Free to start

Answers, AI explanations, and a free readiness check

Sign up free to check your answers with explanations, ask the AI tutor anything on any question, and take the free 2-minute readiness check for a scored result. The full AI mock interview, scored like a real panel, unlocks with Pro.

Practice Testing & Standards free