24,000+ questions & coding problemsSoftware & IT16,274 questionsGovernment jobs26 examsAptitudenew questions every timeAI practice interviewwith feedback65 topics to practiseMechanical1,149 questionsGATE ME9 papersEngineering Mathematics381 questions2-minute checkfreeDSA Problems1,422Civil1,005 questionsGATE CE9 papersCS Fundamentals1,209 questionsYour scores6 skillsSystem Design25Electrical / EEE1,047 questionsGATE EE9 papersRun your codeC++ · Java · PythonLow-Level Design144Electronics & Comm.975 questionsGATE EC9 papersAI help on every questionFull-Stack6,282Chemical1,005 questionsGATE CH9 papersAI whiteboardsystem designWork abroadEurope · remote · transfersESE ME1 paperGATE practice papers2019–2026ESE CE1 paperDate alertsbefore the last dateESE EE1 paperBehavioural courseHR round practiceESE ET1 paperResume optimizerSSC JE ME1 paperApplication trackerSSC JE CE1 paperCompany-wise prepSSC JE EE1 paperRole roadmapsRRB JE1 subjectPriced in ₹UPI · cardsISRO SC1 paperGATE CS9 papersIBPS SO IT1 paperUGC NET CS1 paperSSC CGL26 papersIBPS PO26 papersRRB NTPC26 papersSSC CHSL26 papersIBPS Clerk26 papersSBI Clerk26 papersRRB Group D26 papersSSC CPO26 papersSSC GD26 papers

HSE & Regulatory interview questions

30 real HSE & Regulatory questions from the Plant Operations bank, as asked in Indian campus drives and tech interviews. Every question has a verified answer and an AI-tutor explanation on placd — free to start.

1. What is Factories Act 1948?

Junior
  1. A.post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  2. B.Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  3. C.central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  4. D.MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
Reveal the answer + AI explanation — free account

2. Which term means: "central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers"?

Junior
  1. A.PESO licence
  2. B.Threshold limit value
  3. C.Factories Act 1948
  4. D.MSIHC Rules 1989
Reveal the answer + AI explanation — free account

3. Which statement is correct?

Junior
  1. A.Factories Act 1948 — occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  2. B.Factories Act 1948 — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  3. C.Factories Act 1948 — SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  4. D.Factories Act 1948 — rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
Reveal the answer + AI explanation — free account

4. What is MSIHC Rules 1989?

Junior
  1. A.MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
  2. B.Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  3. C.rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
  4. D.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
Reveal the answer + AI explanation — free account

5. Which term means: "Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans"?

Junior
  1. A.Threshold limit value
  2. B.Chemical Accidents (EPPR) Rules 1996
  3. C.MSIHC Rules 1989
  4. D.Environmental clearance conditions
Reveal the answer + AI explanation — free account

6. Which statement is correct?

Junior
  1. A.MSIHC Rules 1989 — Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  2. B.MSIHC Rules 1989 — occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  3. C.MSIHC Rules 1989 — Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  4. D.MSIHC Rules 1989 — post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
Reveal the answer + AI explanation — free account

7. What is Consent to Establish and Operate?

Junior
  1. A.central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  2. B.MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
  3. C.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  4. D.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
Reveal the answer + AI explanation — free account

8. Which term means: "SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically"?

Junior
  1. A.MSIHC Rules 1989
  2. B.Environmental clearance conditions
  3. C.Consent to Establish and Operate
  4. D.Factories Act 1948
Reveal the answer + AI explanation — free account

9. Which statement is correct?

Junior
  1. A.Consent to Establish and Operate — SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  2. B.Consent to Establish and Operate — SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
  3. C.Consent to Establish and Operate — Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  4. D.Consent to Establish and Operate — MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
Reveal the answer + AI explanation — free account

10. What is Threshold limit value?

Junior
  1. A.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  2. B.post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  3. C.occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  4. D.rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
Reveal the answer + AI explanation — free account

11. Which term means: "occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE"?

Junior
  1. A.Threshold limit value
  2. B.ISO 14001 vs ISO 45001
  3. C.Consent to Establish and Operate
  4. D.Factories Act 1948
Reveal the answer + AI explanation — free account

12. Which statement is correct?

Junior
  1. A.Threshold limit value — post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  2. B.Threshold limit value — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  3. C.Threshold limit value — occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  4. D.Threshold limit value — SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
Reveal the answer + AI explanation — free account

13. What is On-site emergency plan?

Mid
  1. A.occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  2. B.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  3. C.Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  4. D.MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
Reveal the answer + AI explanation — free account

14. Which term means: "MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months"?

Mid
  1. A.Hazardous waste authorisation
  2. B.ISO 14001 vs ISO 45001
  3. C.On-site emergency plan
  4. D.Environmental clearance conditions
Reveal the answer + AI explanation — free account

15. Which statement is correct?

Mid
  1. A.On-site emergency plan — SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  2. B.On-site emergency plan — MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
  3. C.On-site emergency plan — Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  4. D.On-site emergency plan — Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
Reveal the answer + AI explanation — free account

16. What is PESO licence?

Mid
  1. A.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  2. B.occupational exposure limit for airborne chemicals, such as 25 ppm ammonia as an eight-hour time-weighted average, used to set ventilation and PPE
  3. C.post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  4. D.central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
Reveal the answer + AI explanation — free account

17. Which term means: "Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases"?

Mid
  1. A.PESO licence
  2. B.ISO 14001 vs ISO 45001
  3. C.Factories Act 1948
  4. D.MSIHC Rules 1989
Reveal the answer + AI explanation — free account

18. Which statement is correct?

Mid
  1. A.PESO licence — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  2. B.PESO licence — Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  3. C.PESO licence — SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
  4. D.PESO licence — environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
Reveal the answer + AI explanation — free account

19. What is ISO 14001 vs ISO 45001?

Mid
  1. A.environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
  2. B.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  3. C.Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  4. D.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
Reveal the answer + AI explanation — free account

20. Which term means: "environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit"?

Mid
  1. A.ISO 14001 vs ISO 45001
  2. B.MSIHC Rules 1989
  3. C.Threshold limit value
  4. D.Chemical Accidents (EPPR) Rules 1996
Reveal the answer + AI explanation — free account

21. Which statement is correct?

Mid
  1. A.ISO 14001 vs ISO 45001 — Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  2. B.ISO 14001 vs ISO 45001 — environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
  3. C.ISO 14001 vs ISO 45001 — SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  4. D.ISO 14001 vs ISO 45001 — rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
Reveal the answer + AI explanation — free account

22. What is Hazardous waste authorisation?

Mid
  1. A.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  2. B.MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
  3. C.rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
  4. D.SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
Reveal the answer + AI explanation — free account

23. Which term means: "SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal"?

Mid
  1. A.Threshold limit value
  2. B.Hazardous waste authorisation
  3. C.Factories Act 1948
  4. D.Environmental clearance conditions
Reveal the answer + AI explanation — free account

24. Which statement is correct?

Mid
  1. A.Hazardous waste authorisation — MSIHC-mandated document for MAH units with emergency organisation, assembly points, mutual aid and mock drills at least every six months
  2. B.Hazardous waste authorisation — rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
  3. C.Hazardous waste authorisation — SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
  4. D.Hazardous waste authorisation — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
Reveal the answer + AI explanation — free account

25. What is Environmental clearance conditions?

Senior
  1. A.Manufacture, Storage and Import of Hazardous Chemicals rules requiring notification of major accident hazard sites, safety reports, safety audits and on-site emergency plans
  2. B.post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  3. C.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  4. D.SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
Reveal the answer + AI explanation — free account

26. Which term means: "post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office"?

Senior
  1. A.PESO licence
  2. B.ISO 14001 vs ISO 45001
  3. C.Threshold limit value
  4. D.Environmental clearance conditions
Reveal the answer + AI explanation — free account

27. Which statement is correct?

Senior
  1. A.Environmental clearance conditions — post-EC obligations including six-monthly compliance reports, continuous emission monitoring and EMP budget, checked by the MoEFCC regional office
  2. B.Environmental clearance conditions — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  3. C.Environmental clearance conditions — environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
  4. D.Environmental clearance conditions — SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
Reveal the answer + AI explanation — free account

28. What is Chemical Accidents (EPPR) Rules 1996?

Senior
  1. A.SPCB permissions under the Water Act 1974 and Air Act 1981 needed before construction and before operation, renewed periodically
  2. B.Petroleum and Explosives Safety Organisation approval under the Petroleum Act 1934 and SMPV Rules for storing petroleum products and compressed gases
  3. C.environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
  4. D.rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
Reveal the answer + AI explanation — free account

29. Which term means: "rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations"?

Senior
  1. A.ISO 14001 vs ISO 45001
  2. B.Chemical Accidents (EPPR) Rules 1996
  3. C.Environmental clearance conditions
  4. D.PESO licence
Reveal the answer + AI explanation — free account

30. Which statement is correct?

Senior
  1. A.Chemical Accidents (EPPR) Rules 1996 — rules setting up central, state, district and local crisis groups for chemical accident preparedness and response at MAH installations
  2. B.Chemical Accidents (EPPR) Rules 1996 — SPCB permit under the HOWM Rules 2016 fixing waste categories, quantities, 90-day maximum storage and TSDF or co-processing disposal
  3. C.Chemical Accidents (EPPR) Rules 1996 — central law on worker safety, health and welfare, with Chapter IVA provisions for hazardous processes and a safety officer above 1000 workers
  4. D.Chemical Accidents (EPPR) Rules 1996 — environmental management system versus occupational health and safety management system, both PDCA-based and certifiable by third-party audit
Reveal the answer + AI explanation — free account

Free to start

Answers, AI explanations, and a free readiness check

Sign up free to check your answers with explanations, ask the AI tutor anything on any question, and take the free 2-minute readiness check for a scored result. The full AI mock interview, scored like a real panel, unlocks with Pro.

Practice HSE & Regulatory free